Current Nawat at Egyptian ports
  • Mediterranean Sea Next Al Salloum Start 2 March - Duration 2 days ، Rainy
  • Red Sea Next Scorpions (Saad El-Balaa) Start 23 February - Duration 13 day ، Cold
Manual and legislation in accordance with the specialization
Manual and legislation in accordance with the specialization

Manual and legislation in accordance with the specialization

Categories

Please select a category for fast search
Found rows 10
Decisions Diameter Fees
File Language: العربية   (Download)
Decisions of the Arab bridge
File Language: العربية   (Download)
Decisions to engage in acts of maritime transport
File Language: العربية   (Download)
Decisions on maritime transport Coast
File Language: العربية   (Download)
Decisions decisions specialized ports
File Language: العربية   (Download)
Decisions related to maritime employment
File Language: العربية   (Download)
Decisions for storage services
File Language: العربية   (Download)
Decisions marine debris
File Language: العربية   (Download)
Decisions maritime safety
File Language: العربية   (Download)
tariffs applicable in the Egyptian ports
File Language: العربية   (Download)