Current Nawat at Egyptian ports
  • Red Sea El-Wasm (El-Awaa) Start 16 October - Duration 13 day ، Autumn
  • Mediterranean Sea El-Saliba Winds Start 20 October - Duration 3 days ، Mostly` without rains
Commercial Ports
Commercial Ports

Services

Bunkering and Supplies

    • Fresh water
    • Solar
    • Diesel
    • Oils
    • Fuel
    • Heavy fuel
    • Machinery requirements
    • Pilotage and tugging
    • Food stuff
    • Buntering vessels
    • Spare parts
    • Fumigation
    • Waste water reception
    • Light fuel
    • Accomodation requirements
    • Ship repair: a workshop is available for simple repair
    • Cleaning fees: 5% of total fees for all vessel types except for general cargo vessels it's 3%

Security, Safety and Environmental Preservation Properties

  • Rescue and fire fighting: A 1800 hp tug equipped with fire extinguishing pumps with 400 tons/hr capacity.
  • Medical Facilities: ambulance - hygienic isolation
  • Pollution combating: anti-fouling equipments are available.

IMO Secretary-General

Tackling COVID-19 a voyage together

Achievements