Current Nawat at Egyptian ports
  • Red Sea Next Al-Tharaya (Al-Bateen) Start 25 May - Duration 13 day ، Summer
Commercial Ports
Commercial Ports

Navigation

Entrance and Exit Strait

270 m. length, 100 m. width, 9-11 m. depth.

Approach Area

An imaginary line from the sea side with 1 nm length linking the edges of the Eastern and North Western Breakwaters

Pilotage

Two senior pilots undertake Pilotage works ,pioltage is compulsory and is undertaken by the port Authourties pilots

Berths

Detailed Berths Information

Berth Number Length (m.) Depth(m.) Breadth(m.) Year of Construction Number of Bollards
Dry Bulk
1 242 7-8 10 1984 10
Services and Launches
2 122 3-4 5 1984 5
Total
2 Berth 364 3-8      

IMO Secretary-General

Tackling COVID-19 a voyage together

Achievements