Current Nawat at Egyptian ports
  • Red Sea El-Wasm (El-Ghafr) Start 11 November - Duration 13 day ، Autumn
  • Mediterranean Sea El-Moknesa Start 16 November - Duration 4 days ، Very Rainy
  • Mediterranean Sea Next Rest of El-Moknesa Start 22 November - Duration 4 days ، Rainy

Ismail: developing maritime transport system in Egypt includes ports and roads network

  Prime Minister Engineer/ Sherif Ismail said that Egypt hosting Maritime transport Euro- Mediterranean conference is considered a completion of its role in supporting cooperation frame work between Mediterranean countries.

   He also added that the Union we are seeking for is based on refuting disputes aside and fulfilling development of all Mediterranean nations and that this conference comes simultaneously with government concern to support and develop maritime transport system.

 Ismail again declared that maritime transport system in Egypt includes development of ports and roads network and rehabilitation of railways, pointing out that the government   gives concern to economic development requirements on regional and international levels.